{"id":4569,"date":"2026-11-23T07:55:00","date_gmt":"2026-11-23T07:55:00","guid":{"rendered":"https:\/\/www.besteyehospitals.com\/blog\/?p=4569"},"modified":"2026-11-23T07:55:00","modified_gmt":"2026-11-23T07:55:00","slug":"front-desk-team-fallback-story","status":"publish","type":"post","link":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/","title":{"rendered":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B"},"content":{"rendered":"<p>Everything below is invented, yet anybody who has staffed a crowded hospital reception will know the feeling. It follows a small, fictional administration team at an eye hospital through one awful Monday and the months afterwards, when they decided to build a proper plan B for the paperwork side of their work. Nothing clinical appears here: no procedures, no results, no advice. It is purely about booking desks, records and the people who answer the phone.<\/p>\n<h2>Monday, 8:40: the screen goes grey<\/h2>\n<p>The team had four people on the morning shift: a desk supervisor, two booking coordinators and a records clerk. At twenty to nine the appointment system stopped responding. Patients were already queuing, and a handful of families had come from far away. The supervisor asked if anyone knew what to do. Everyone had a different idea. One coordinator wrote names on a scrap of paper, another phoned the technical contact, and the clerk started a second list on the back of a leaflet. By ten, the lists did not match, two people had been told two different times and a family waiting since early morning had grown understandably cross.<\/p>\n<p>The system came back before lunch, and the damage was mostly to nerves and trust. But the supervisor said something at the end of the day that stuck: &#8220;We were not short of effort. We were short of a plan we had agreed beforehand.&#8221;<\/p>\n<h2>The team meeting: three columns<\/h2>\n<p>On Thursday the four sat down with a big sheet of paper and drew three columns: what we depend on, what we do if it stops, and how we will know. They listed the booking system, the phone line, the printed forms, the queue board and the records room key. For each, they agreed on a plain substitute and on a trigger.<\/p>\n<ul>\n<li><strong>Booking system down:<\/strong> switch to a printed diary page kept in a labelled tray, one sheet per clinic session. Trigger: no response for five minutes by the desk clock.<\/li>\n<li><strong>Phone line down:<\/strong> a mobile number on a sign at the desk and a message on the entrance board. Trigger: two failed outgoing calls.<\/li>\n<li><strong>Printer jam:<\/strong> handwritten slip with a duplicate in the tray. Trigger: no output after one retry.<\/li>\n<li><strong>Queue board off:<\/strong> a numbered ticket roll. Trigger: board blank at opening time.<\/li>\n<\/ul>\n<p>The supervisor owned the call to switch. The deputy, who was named on the sheet, took over when the supervisor was away.<\/p>\n<h2>Practising it once<\/h2>\n<p>The team staged a short drill on a quiet afternoon. The supervisor announced &#8220;diary down&#8221;, the coordinators moved to the paper pages, the clerk logged each entry in a single column and a volunteer pretended to be a patient with a change of appointment. The drill took fifteen minutes and exposed two problems: the paper diary lacked a column for contact numbers, and nobody knew who would key the entries back into the system afterwards. They fixed both on the spot and assigned the re-entry to the records clerk, with a second person checking it.<\/p>\n<h2>The next outage<\/h2>\n<p>Six weeks later, the system slowed to a crawl on a heavy day. The coordinator closest to the screen glanced at the clock, saw that five minutes had passed and said the agreed phrase. Nobody argued. The paper pages came out, patients were told calmly what was happening and the queue kept moving. When the system returned, the clerk entered the day&#8217;s changes and a colleague compared the two records. The supervisor later said that the difference was not that the outage was shorter; it was that the team felt in control of it.<\/p>\n<h2>Widening the circle: families get a fallback too<\/h2>\n<p>The team noticed that families had their own weak points, and began handing out a short card at booking. It listed the desk&#8217;s mobile number, a reminder to bring identity papers and referral letters, and a line about how to rebook if the visit was missed. They also looked at what remote options exist for follow-up administration; a post on this site covering <a href=\"https:\/\/www.besteyehospitals.com\/blog\/hospitals-offering-telehealth-for-eye-care-services-benefits-and-safety\/\">remote eye-care services and how they work<\/a> offered some general background, though what suits any individual is a matter for their care team.<\/p>\n<p>For families dealing with paperwork-heavy tasks elsewhere, such as bank forms, another piece on this blog, <a href=\"https:\/\/www.besteyehospitals.com\/blog\/heading-to-the-bank-a-kisan-credit-card-checklist-for-first-time-applicants\/\">a document checklist for newcomers walking into a bank branch<\/a>, shows how a simple list of documents prevents a wasted trip. The same thinking applies to a hospital visit.<\/p>\n<h2>Handling the hard conversations<\/h2>\n<p>The first minutes of an outage are as much about tone as about paper. The team agreed on a short script for the desk: say what is happening, say what you are doing about it and give a realistic idea of the wait. Patients rarely mind a delay they understand. What frustrates them is silence, or three different answers from three different people. The supervisor also asked staff to step away briefly if a conversation became heated and hand it to a colleague, which the team found cooled things quickly.<\/p>\n<h2>What the team learned<\/h2>\n<ol>\n<li>Effort without agreement wastes time. The plan has to be settled before the bad morning.<\/li>\n<li>A trigger beats a feeling. &#8220;Five minutes by the desk clock&#8221; ended every debate.<\/li>\n<li>One owner, with a named deputy, keeps the switch quick.<\/li>\n<li>Drills find gaps that planning meetings miss.<\/li>\n<li>Re-entry matters. A fallback is not finished until the record is whole again.<\/li>\n<\/ol>\n<h2>Looking after the team itself<\/h2>\n<p>A fallback plan quietly protects staff as well as patients. After the grey Monday, two coordinators said they had felt personally responsible for the chaos, even though the fault lay elsewhere. Once there was a written routine, they could see that the system, not the individual, had been unprepared. The supervisor made a habit of a five-minute chat after any disruption to ask what had gone well and what to change, and the sheet on the wall was updated the same afternoon.<\/p>\n<h2>Small touches that helped<\/h2>\n<p>A few details turned out to matter more than expected. The paper diary pages were pre-printed with the day&#8217;s sessions, so no one had to draw lines during a crisis. The tray was kept at the desk, not in a cupboard. Each page carried a small reminder of the trigger and the owner. New staff were shown the tray on their first day, and the card for families was refreshed whenever a number changed. None of these cost much, but together they made the fallback feel like part of the furniture rather than an emergency measure.<\/p>\n<h2>A word about the spare hour<\/h2>\n<p>The coordinators also noticed that families sometimes had unexpected gaps in their day after a rebooking, so a few staff members would mention local ideas when asked. One resource they sometimes pointed to was <a href=\"https:\/\/myeventnow.com\/\">MyEventNow, a site that lays out upcoming events and venues by category and also hosts a blog and community forum<\/a>. Staff never presented it as an endorsement. It was simply somewhere a family could look for inspiration, followed by the standard suggestion to confirm everything with the organisers.<\/p>\n<h2>Borrowing the method for your own reception<\/h2>\n<p>You can copy the method in an afternoon. Gather the people who staff the desk, list what the day depends on, and agree one substitute and one trigger for each item. Name the owner and a deputy, print the pages, and try a short drill. Then revisit the sheet after the first real disruption. Small teams often assume this is a luxury for bigger organisations, but a small team has the most to gain, because every absent colleague matters.<\/p>\n<h2>The ending, such as it is<\/h2>\n<p>A year on, the team still smiles about that grey Monday. The paper pages have been used a handful of times, always briefly, and the supervisor says she no longer dreads the start of the week. New arrivals learn the three columns on their first morning. The story is not about a clever system. It is about four people who agreed, in advance, what they would do when something stopped working, and then did it calmly when the moment came.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A fictional story of a hospital front-desk team whose booking screen froze, and the three-column fallback plan they built afterwards, with no clinical content.<\/p>\n","protected":false},"author":14,"featured_media":4570,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1594],"tags":[],"class_list":["post-4569","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-healthcare-it"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals<\/title>\n<meta name=\"description\" content=\"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals\" \/>\n<meta property=\"og:description\" content=\"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/\" \/>\n<meta property=\"og:site_name\" content=\"Best Eye Hospitals\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T07:55:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Beena Banerjee\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Beena Banerjee\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/\"},\"author\":{\"name\":\"Beena Banerjee\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/#\\\/schema\\\/person\\\/614bf28f9ca4e8fe090afce3b106f210\"},\"headline\":\"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B\",\"datePublished\":\"2026-11-23T07:55:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/\"},\"wordCount\":1359,\"image\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/b2a-banner-650769-banner.png\",\"articleSection\":[\"Healthcare IT\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/\",\"url\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/\",\"name\":\"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/b2a-banner-650769-banner.png\",\"datePublished\":\"2026-11-23T07:55:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/#\\\/schema\\\/person\\\/614bf28f9ca4e8fe090afce3b106f210\"},\"description\":\"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/b2a-banner-650769-banner.png\",\"contentUrl\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/b2a-banner-650769-banner.png\",\"width\":1200,\"height\":630},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/front-desk-team-fallback-story\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/\",\"name\":\"My blog\",\"description\":\"Connecting You to the World\u2019s Best Eye Hospitals\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/#\\\/schema\\\/person\\\/614bf28f9ca4e8fe090afce3b106f210\",\"name\":\"Beena Banerjee\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g\",\"caption\":\"Beena Banerjee\"},\"url\":\"https:\\\/\\\/www.besteyehospitals.com\\\/blog\\\/author\\\/beena-banerjee\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals","description":"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/","og_locale":"en_US","og_type":"article","og_title":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals","og_description":"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.","og_url":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/","og_site_name":"Best Eye Hospitals","article_published_time":"2026-11-23T07:55:00+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png","type":"image\/png"}],"author":"Beena Banerjee","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Beena Banerjee","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#article","isPartOf":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/"},"author":{"name":"Beena Banerjee","@id":"https:\/\/www.besteyehospitals.com\/blog\/#\/schema\/person\/614bf28f9ca4e8fe090afce3b106f210"},"headline":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B","datePublished":"2026-11-23T07:55:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/"},"wordCount":1359,"image":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#primaryimage"},"thumbnailUrl":"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png","articleSection":["Healthcare IT"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/","url":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/","name":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B - Best Eye Hospitals","isPartOf":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#primaryimage"},"image":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#primaryimage"},"thumbnailUrl":"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png","datePublished":"2026-11-23T07:55:00+00:00","author":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/#\/schema\/person\/614bf28f9ca4e8fe090afce3b106f210"},"description":"A fictional hospital front-desk team story about a booking system outage and the fallback plan, triggers and drills they built afterwards.","breadcrumb":{"@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#primaryimage","url":"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png","contentUrl":"https:\/\/www.besteyehospitals.com\/blog\/wp-content\/uploads\/2026\/11\/b2a-banner-650769-banner.png","width":1200,"height":630},{"@type":"BreadcrumbList","@id":"https:\/\/www.besteyehospitals.com\/blog\/front-desk-team-fallback-story\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.besteyehospitals.com\/blog\/"},{"@type":"ListItem","position":2,"name":"One Grey Monday at the Desk: A Front-Desk Team Builds Its Plan B"}]},{"@type":"WebSite","@id":"https:\/\/www.besteyehospitals.com\/blog\/#website","url":"https:\/\/www.besteyehospitals.com\/blog\/","name":"My blog","description":"Connecting You to the World\u2019s Best Eye Hospitals","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.besteyehospitals.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.besteyehospitals.com\/blog\/#\/schema\/person\/614bf28f9ca4e8fe090afce3b106f210","name":"Beena Banerjee","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b148e166e14971ee28ffb489b5e7ea9a458e8cce2410c73e8c214eebbafdb29?s=96&d=mm&r=g","caption":"Beena Banerjee"},"url":"https:\/\/www.besteyehospitals.com\/blog\/author\/beena-banerjee\/"}]}},"_links":{"self":[{"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/posts\/4569","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/comments?post=4569"}],"version-history":[{"count":1,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/posts\/4569\/revisions"}],"predecessor-version":[{"id":4639,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/posts\/4569\/revisions\/4639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/media\/4570"}],"wp:attachment":[{"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/media?parent=4569"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/categories?post=4569"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.besteyehospitals.com\/blog\/wp-json\/wp\/v2\/tags?post=4569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}